How long it takes for the coating to fully cure?
Curing of the coating can be described in 3 stages:
- Initial curing of the outside layer of the coating which takes approx. 2 hours. After that time the surface is ready to be coated with a topper.
- It takes 24 hours for the base coating to cure and be ready to leave your workshop.
- We advise not to wash your car using any chemical during the first 7 days after applying the base layer.